NT: Asbestos removal duties and clearance before reoccupation
NT WorkSafe lists this approved code as varied on 14 September 2023. It addresses removal work, rather than routine management of asbestos that remains in place. Start with the type and condition of the material, the work proposed and the actual Northern Territory licensing requirements.
Check the removal and clearance records
The approved code PDF, sections 3.5–3.11, explains the control plan for licensed removal, notification, access controls, decontamination, waste, clearance and air monitoring. The licensed removalist prepares the job-specific plan before work begins. The commissioning party also has duties; class and circumstances affect who may carry out clearance and when air monitoring is required.
For custodial premises, plan access and alternative safe areas before works start. Keep the scope of work, licence details, site notifications and the relevant clearance record together. Do not assume the area can reopen merely because the contractor has finished removing material. Confirm the applicable clearance requirements under the regulations and obtain evidence that they have been met. Site security procedures must be coordinated with, not substituted for, exposure controls.
This is an approved code under section 274 of the NT WHS Act. The source PDF is linked rather than copied.

Comments