NT construction work: use the 2026 thresholds, not an outdated template
Construction safety needs both task-level controls and coordination across the site. The code distinguishes high-risk construction work requiring a safe work method statement (SWMS) from construction-project arrangements involving a principal contractor and WHS management plan. A SWMS must describe actual high-risk work and controls, not simply collect signatures. See chapters 2–5 and appendices E–I.
Two changes after the code PDF
NT WorkSafe lists this code as varied on 12 March 2026, but later amendments change two figures:
From 28 May 2026, regulation 292’s construction-project threshold increased from $500,000 to $1 million.
Transition: regulation 837 preserves the former regulation 292 for a project where connected construction work began before 28 May 2026. Do not reclassify an existing project solely because the new threshold is higher. See the amending Regulations, printed page 2.
From 17 July 2026, regulation 291’s fall-height trigger increased from more than 2 metres to more than 3 metres for residential construction only. The more-than-2-metre trigger remains for non-residential work.
These are existing changes as at November 2026, not proposals. Other high-risk categories can require a SWMS regardless of these heights. Falls below a SWMS threshold still require appropriate risk controls. See NT WorkSafe’s amendment summary and the current Regulations.
Correctional work is not automatically residential
Do not classify prison construction as residential merely because people sleep there. Confirm the statutory classification of the particular work. For non-residential prison work, retain the more-than-2-metre fall trigger. A separate staff dwelling may require a different assessment.
Before work, record the project valuation, classification, all high-risk categories, responsible contractor and coordination arrangements. Compare the SWMS with the actual access restrictions, occupied areas and emergency routes. If those differ, resolve the mismatch before relying on the document.
Limits
This is a threshold and coordination guide, not a complete construction compliance checklist. Approved codes are practical guidance; current legislation prevails over inconsistent figures in an older PDF.