NT: Demolition work in operating workplaces
The PDF currently linked by NT WorkSafe records approval in Gazette G9 of 4 March 2020. It deals with demolition safety, including work on part of a structure.
What the approved code covers
Sections 2–4 address risk management, planning and site-specific controls. Consider unplanned collapse, adjacent structures, hazardous materials, falling items and live services together. Where the proposed work is high-risk construction work, check the current safe work method statement requirements.
What to verify at the workplace
For partial demolition at an occupied facility, require a plan for physical separation, continued safe access and emergency exits, and verification of service isolation. Do not rely on a security perimeter to protect other workers from demolition hazards.
Official code PDF (linked, not reproduced).

Comments