NT: Excavation work around essential services
The PDF currently linked by NT WorkSafe records approval in Gazette G9 of 4 March 2020. It covers risks from excavation rather than only from trenches deep enough to trigger a particular procedural requirement.
What the approved code covers
Sections 2–4 and 6 distinguish planning, underground services, adjacent loads and structures, and ground collapse controls. Obtain current information on essential services before excavation and assess whether spoil, nearby plant or vehicle traffic may impair stability.
What to verify at the workplace
At a corrections site, coordinate the utility and emergency-access plans with the contractor. Protect workers and others from access to the excavation, and require someone to check that controls still suit the ground and weather before work continues.
Official code PDF (linked, not reproduced).