NT spray painting and powder coating: control the whole process
Spraying and powder coating involve more than application. Surface preparation, mixing, hopper filling, recovery, filter cleaning and spill response can expose workers. Identify the actual products and processes, including cleaning chemicals, before choosing controls (chapters 2–4).
Ventilation must match the job
The code addresses booths, local exhaust ventilation, fire and explosion, static electricity and personal protection. For powder coating it recommends controlling dust during filling and recovery and interlocking relevant supplies with extraction. For spray booths, airflow direction and purge arrangements matter as well as having a fan. See sections 3.4, 3.6 and 4.1–4.2, especially pages 32–39.
Product substitution can reduce risk, but a replacement product still needs assessment. Health monitoring requirements depend on the hazardous exposure circumstances, not merely the job title (chapter 5).
A workshop check
Trace one coating job from opening the container to disposal of waste. Identify everyone who enters the space, where contaminated air travels, and what happens if extraction fails. Check cleaning tasks that occur after the apparent production job is finished. A booth inspection should consider whether the current item, spraying position and work sequence match its intended operation.
Keep product safety data, ventilation maintenance evidence, operator instructions and the exposure assessment together. Do not interpret the absence of reported symptoms as proof that exposure is controlled. Conversely, symptoms alone do not identify a particular chemical cause.
Status and limits
NT WorkSafe lists this code as varied on 14 September 2023. It is approved guidance, not a substitute for current chemical and equipment requirements. A competent assessment is needed where ventilation performance or the properties of a coating are uncertain.

Comments