NT: Tower cranes: coordinating work around lifting zones
The PDF currently linked by NT WorkSafe records section 274 approval in Gazette G19 of 14 September 2023. It concerns tower cranes, including installation, operation and dismantling.
What the approved code covers
Sections 2–4 describe risk management, planning and working around other activity. The plan should account for people near the lift, other plant, nearby powerlines, communication, safe access and changed conditions. Confirm the applicable licensing and inspection requirements separately.
What to verify at the workplace
When a contractor brings a crane into an operating precinct, verify how responsibilities are allocated and who can halt the lift. Coordinate the lift schedule, exclusion zone and emergency access so ordinary workplace traffic cannot defeat the planned controls.
Official code PDF (linked, not reproduced).

Comments