Victoria: demolition planning must protect the workplace next door
WorkSafe Victoria’s Demolition compliance code was published on 19 December 2019 and remains available on its official resource page.
Practical points
Before demolition, identify essential services, pipes and lines and establish how they will be safely removed or controlled. The code distinguishes abolishing affected gas and electricity services from merely disconnecting them. Coordinate with the utility provider where required.
Planning must consider adjoining structures, their support, ground conditions and vibration. Temporary support requires competent design. The code also addresses asbestos, exclusion zones, public protection and safe work method statements.
An illustrative workplace example
For a hypothetical redevelopment beside an operating prison wing, check who coordinates the building contractor, utility providers and operational managers. A secure fence is not evidence that structural, service or airborne risks have been addressed. This is a planning example, not a demolition method.
Status and source
Following the code provides deemed compliance only for duties it covers. Other lawful methods are possible; the code does not replace legislation. General education, not individual legal or engineering advice.
Read the official WorkSafe resource page and complete official PDF.

Comments